Event Details
Schedule, pricing, and info
ID: 26
DAYHIKE - Includes guide, permit & insurance
[minimum 7pax to form a group]
๐
Date: 27 June 2026
โฐ๏ธ Elevation: 1642M
Total Distance: 23km
Total Time : 12 - 15hours
Elevation Gain: +-1400m
๐ฏ Location :
https://maps.app.goo.gl/Zs2ZhePcGiV3gB977
Payment Detail:
KELAB REKREASI GGH MALAYSIA
CIMB 8606308142
Tentative Itinerary:-
04.00 - Gather at SK Pos Gedong
04.15 - Briefing and start hike
~ total river crossing 6 (3 major river)
08.00 - Reached Kem Tigok
08.25 - River crossing last WP๐ง
- Last 4km to Bah Gading peak
10.00 - Kem Permatang
11.00 - Reached Bah Garding peak โฐ
(Rest / Photo / Regroup)
11.45 - Descend from peak
12.30 - Kem Permatang
14.30 - Kem Tigok
15.00 - Tigok waterfall
15.15 - Descend
16.30 - Changkat Lilin peak (738m)* bonus
18.00 - Trailhead carpark @ SK Post Gedong
===== End of Hike ====
โPlease note that the proposed hiking itinerary is tentative and may be adjusted depending on weather conditions and the pace of the hikers.
REF: ๅฎๆด ๅไบซ
https://bit.ly/GunungBahGading